Development Consent Conditions
GUIDE NOTE: Also include appropriate appendix references (e.g. Appendix A)
Review of Environmental Factors
Complying Development
GUIDE NOTE: Insert the location of the complying development certificate and conditions.
The following clause is to be included at the end of “Preliminaries – General (GC21)”
The following clause is to be included at the end of “Preliminaries – Administrating and Contracting (Minor Works)”
A new sequential clause number is to be used for this additional clause
Alternative 1
FIELD DATA CAPTURE
Alternative 2
FIELD DATA CAPTURE
GUIDE NOTE: Insert section number in clause “Field Data Capture” and insert version date of the reference document.
GUIDE NOTE: Insert section number in clause “Field Data Capture” and insert version date, project name and tender date after “Specification for Field Data Capture” in clause.
General – Preliminaries – GC21 Contract
Administration and Contracting – Preliminaries – Minor Works Contracts
A new sequential clause number should be used for this additional clause.
The following clause is to be included at the end of:
Administration and Contracting – Preliminaries – Minor Works Contracts
Certification of Compliance with Building and Fire Regulations
Dangerous Goods Licence, LPG Storage
Safe Work on Roofs
Reference Document
Asset Maintenance Data Capture of Plant and Equipment
Inclusions in Contractors Documents (GC21 Contracts)
Generally
Architectural Drawings
Architectural Specifications
GUIDE NOTE: Refer to SG / DOOR HARDWARE
Structural & Civil Engineering Documents
Electrical Services Documents
Hydraulic Services Documents
Mechanical Services Documents
Lift Services Documents
SITEWORKS: This may also include the layout and details for the school sign.
DETAILS: Include Science labs (where applicable).
FURNITURE LAYOUT: The furniture layouts may be incorporated onto the Building/Block Floor Plans drawing(s).
ELECTRICAL SERVICES: Make submission to the Electricity Distributor to determine requirements that may affect the project. If initial contact has been made with the Electrical Distributor it should be outlined in the Electrical Services trade section of the specification. Make all necessary applications to the Electricity Distributor for electricity supply on behalf of the property owner. Advise the Principal’s Authorised person should advice be received that the Electricity Distributor requires an easement be created or a lease granted for the Distributor’s assets. The scope of this contract includes payment by the contractor of all costs for electricity supply, including all monopoly costs and fees together with the costs of all contestable works. It should be stated in the Electrical Services trade section of this specification if the electrical design process has already included network analysis, payment of monopoly fees or design of electricity supply.
Note: Meet all charges payable to the Electrical Distributors for temporary supply and inspection/testing of the installation.”
MECHANICAL: (Include specific text if applicable. Check with engineers).
LIFTS: (Include specific text if applicable. Check with appropriate engineers).
Dimensions
Preferred Subcontractors
Conformance Records
GUIDE NOTE: If applicable, In the column “Time Records Required” reference **relevant milestones or separable portions (depending on type of contract).
Conformance records |
Time when records required |
Completed Inspection & Test Plans and associated Checklists |
With each Progress Claim |
As-Built Documents (Work as Executed Documents) |
In accordance with Clause |
Dangerous Goods Licence, LPG Storage - Licence for LPG storage of 300 kg or more if connected for use or 150 kg if not connected for use GUIDE NOTE: Refer to Dangerous Goods Licence, LPG Storage (EFSG Specification Guide – Preliminaries).
|
Prior to completion of >** |
Termite Control Management - Completion Inspection – Report on the efficacy of the termite control system/s. |
14 working days prior to completion. |
Termite Control System - Installers certification of compliance: Physical barriers systems to AS 3660.1. |
Prior to completion of >** |
Timber Finishes and Treatment - Certificate showing satisfactory evidence that the timber has been treated to |
Prior to completion of >** |
Light Timber Framing/ Timber Flooring and Decking - Certification of Timber Species – Suppliers Certificate. |
Prior to completion of >** |
Roofing – Rotary Roof Ventilators |
Prior to completion of >** Prior to completion of >**
|
Roof Access Safety Systems
GUIDE NOTE: Refer to NATSPEC Roof Access Safety Systems.
|
Prior to completion of >** |
Roofing - Tanks for Potable Water Manufacturer’s certificate: Manufacturer’s certificate for all tanks, certifying to AS/NZS 4020 that all coating materials used inside the reservoir are suitable for potable water. |
Prior to completion of >** |
Doors and Hatches - Security Gate/s – Certification that security gate/s have been manufactured and installed by holders of licenses in accordance with the Security Industry regulations and Acts. |
Prior to completion >** |
Door Hardware – Mechanical Locksets – NATA registered independent laboratory certification that the locksets meets the specified durability and security requirements to AS 4145.2 |
Prior to completion >** |
Windows - Security grille/s – Certification that security grille/s have been manufactured and installed by holders of licenses in accordance with the Security Industry Regulations and Acts. |
Prior to completion >** |
Lining – Pinboard Wall Lining – Manufacturers and suppliers certification that the pinboard wall lining complies with the specification. |
Prior to completion >** |
Room Dividers - Operable walls – Manufacturers operation and maintenance manual. |
Prior to completion >** |
Resilient flooring - Certification that the supply and installation of resilient flooring have been sourced from one of the listed Preferred Subcontractors or Selected Subcontractors nominated in the project EFSG Specification Guide. |
Prior to completion >** |
Carpet - Certification that the carpet, installation, underlay/underfelt and accessories have been sourced from one of the listed Preferred Subcontractors or Selected Subcontractors nominated in the project EFSG Specification Guide. |
Prior to completion >** |
Metalwork- Basketball Backboard Support Post and Assemblies (Games Court): Certification by a structural engineer. |
Prior to completion of >** |
Tapware - Thermostatic Mixing Valves - Manufacturers printed technical manual for installation, commissioning and maintenance. |
Prior to completion of >** |
Certification of Compliance with Building and Fire Regulations: Certification of Compliance in accordance with the requirements stated in the CERTIFICATION OF COMPLIANCE WITH BUILDING AND FIRE REGULATIONS – PRELIMINARIES. |
Prior to completion of >** |
Field Data Capture: All scaled current plans and textual data for schools as required for Field Data Capture. GUIDE NOTE: Refer to EFSG SG / FIELD DATA CAPTURE section.
|
Prior to completion of >**” |
Asset Data Capture: The collection of data that will be used to include the asset elements into DoE’s maintenance contracts. |
4 weeks prior to completion of >**” |
Product/Service Conformance
Product/Service Conformance |
Time Records Required |
Dangerous Goods Licence, LPG Storage – Licence for LPG storage of 300 kg or more if connected for use or 150 kg if not connected for use |
Prior to completion |
Termite Control Management – Completion Inspection – Report on the efficacy of the termite control system/s. |
14 working days prior to completion |
Termite Control System - Installers certification of compliance: Physical barriers systems to AS 3660.1. |
Prior to completion of >** |
Timber Finishes and Treatment – Certificate showing satisfactory evidence that the timber has been treated to |
Prior to completion |
Light Timber Framing/ Timber Flooring and Decking – Certification of Timber Species – Suppliers Certificate. |
Prior to completion |
Roofing – Rotary Roof Ventilators |
Prior to completion of >** Prior to completion of >**
|
Roof Access Safety Systems
|
Prior to completion of >** |
Roofing – Tanks for Potable Water Manufacturer’s certificate: Manufacturer’s certificate for all tanks, certifying to AS/NZS 4020 that all coating materials used inside the reservoir are suitable for potable water. |
Prior to completion of >** |
Doors and Hatches – Security Gate/s – Certification that security gate/s have been manufactured and installed by holders of licenses in accordance with the Security Industry regulations and Acts. |
Prior to completion |
Door Hardware – Mechanical Locksets – NATA registered independent laboratory certification that the locksets meets the specified durability and security requirements to AS 4145.2 |
Prior to completion >** |
Lining – Pinboard Wall Lining – Manufacturers and suppliers certification that the pinboard wall lining complies with the specification. |
Prior to completion >** |
Windows – Security grille/s – Certification that security grille/s have been manufactured and installed by holders of licenses in accordance with the Security Industry Regulations and Acts. |
Prior to completion |
Room Dividers - Operable walls – Manufacturers operation and maintenance manual. |
Prior to completion >** |
Metalwork – Basketball Backboard Support Post and Assemblies (Games Court): Certification by a structural engineer. |
Prior to completion |
Tapware – Thermostatic Mixing Valves - Manufacturers printed technical manual for installation, commissioning and maintenance. |
Prior to completion |
Certification of Compliance with Building and Fire Regulations: Certification of Compliance in accordance with the requirements stated in the CERTIFICATION OF COMPLIANCE WITH BUILDING AND FIRE REGULATIONS – PRELIMINARIES. |
Prior to completion |
Field Data Capture: All scaled current plans and textual data for schools as required for Field Data Capture. |
Prior to completion |
Asset Data Capture: The collection of data that will be used to include the asset elements into DoE’s maintenance contracts. |
4 weeks prior to completion |
Operating and Maintenance Manuals and Keys Handover
Operating and Maintenance Manuals & Keys |
Roofing – Tanks for Potable Water Maintenance manual: Supply a maintenance manual clearly describing maintenance procedure of the system. |
Door Hardware – Take receipt of all appropriate keys. |
Door Hardware – Two copies of the factory master keying schedule. |
Terrazzo – Precast - Cubicle partitions – Completion – Care and cleaning recommendations including anti graffiti coating applications. |
Applieed Timber Finishes - Mosaic Parquetry- Laminated maintenance manuals. |
Resilient –Finishes – Laminated maintenance manuals. |
Carpets – Laminated maintenance manuals. |
Painting – Floor finish maintenance. |
Miscellaneous Furniture - Telescopic work platform: Manufacturers instruction manual and instructions for safe use. |
Landscape - Landscaping maintenance manual. |
Electrical Services – Switchboards, ceiling fans, electronic security, fire detection and alarm switches. |
Hydraulic Services – Hot water units, fire fighting services, fire extinguishers and gas heaters |
Subcontractors Warranties/Guarantees |
Roofing - Roof Ventilators (Rotary) – Guarantee. |
Roofing - Roofing materials manufacturer’s published product warranties. |
Roofing - Tanks for Potable Water: Guarantee against linear linkage for a minimum period of 20 years. |
Glazing – Glass manufacturer’s warranty. |
Miscellaneous Furniture – Manufacturers and installers warranties against defective workmanship and wrong installation. |
Operating and Maintenance Manuals and Keys Handover
Operating and Maintenance Manuals and Keys |
Roofing - Roof manufacturer’s or supplier’s maintenance manual/s. |
Roofing - Tanks for Potable Water Maintenance manual: Supply a maintenance manual clearly describing maintenance procedure of the system. |
Doors and Hatches - Maintenance - Manufacturer’s published recommendation for service use. |
Windows - Maintenance – Window manufacturer’s published instructions for operation, care and maintenance. |
Glazing – Manufacturer’s maintenance manual for service use. |
Door Hardware - Take receipt of all appropriate keys. |
Door Hardware - Two copies of the factory master keying schedule. |
Room Dividers - Operable Walls - Manufacturer’s maintenance published manual for service use. |
Terrazzo – Precast - Cubicle partitions – Completion – Care and cleaning recommendations including anti graffiti coating applications. |
Applied Timber Flooring - Mosaic Parquetry- Laminated maintenance manuals. |
Resilient Finishes - Laminated maintenance manuals. |
Carpets - Laminated maintenance manuals. |
Painting - Floor finish maintenance. |
Landscape - Landscaping maintenance manual. |
Electrical Services – Switchboards, ceiling fans, electronic security, fire detection and alarm switches. |
Hydraulic Services – Hot water units, fire fighting services, fire extinguishers and gas heaters” |
Site Access and Limitations
Occupied Premises
Working hours for work under the contract
Carry out demolition work, jack-hammering, compressor work, scabbling or grit blasting at times agreed with the Principal and the School Principal.
Site Management
For visits, inspections and work to be carried out, outside the Contractor’s Temporary Security Fence, the Contractor and their agents or representatives must present themselves to the school administration, show identification that confirms their association with the project and the purpose of the visit and comply with any instruction given by the school staff.
Occupational Health and Safety Management
Project OHS Management Plan
SITE – PRELIMINARIES (GC21)
SITE AND WORKS – PRELIMINARIES (MINOR WORKS).
Include the following clause at the end of the appropriate preliminaries section.
A new sequential clause number is to be used for this additional subclause.
Identified Hazardous Substances
The Contractor is responsible for the control and decontamination of the hazardous substances identified in - > SCHEDULE TO PRELIMINARIES - SCHEDULE OF IDENTIFIED HAZARDOUS SUBSTANCES”. All work to comply with the requirements specified in HAZARDOUS SUBSTANCES - PRELIMINARIES.
Environmental Management Plan
The contractor must prepare a site specific Environmental Management Plan that must comply with the NSW Government Environmental Management Systems Guidelines (EMS Guidelines), available on the Internet at:
Temporary Services Provided by the Principal
If required, connect temporary water and electricity lines for the contract works to the School’s supplies. Make the connection at a time agreed with the School (through the Authorised Person) so that the operations of the School are not disrupted.
GUIDE NOTE: Include the following clause:
Restricted Materials
GUIDE NOTE: Include the following clause:
Common Materials and Workmanship Problems
Identified Hazardous Substances Schedule
Samples for Approval Schedule
Principal Supplied Items Schedule
Preferred Subcontractors Schedule